TI3003

TI3003 INTEGRATED SYSTEM DESIGN PRACTICE II
Credits: 2 Course Coordinator:
Contact hours:

 

Two hour class session each week Instructor(s): AM
Textbook(s) and other supplemental materials 1.      Sutalaksana, I.Z., dkk. Teknik Tata Cara Kerja. Laboratorium Tata Cara Kerja dan Ergonomi, Teknik Industri ITB, Bandung. 1979

2.      Barnes, R.M.; Motion and Time Study, Design and Measurement of Work, John Wiley & Sons, Inc.; 1982, New York, USA.

3.      Elsayed, E.A. & Boucher, T.O. Anaysis and Control of Production System 2nd . New Jersey. Prentice Hall, 1994.

4.      Groover M.P., Fundamentals of modern manufacturing, 5th Edition, Jon Wiley & Son, 2012

5.      Sipper, Daniel et all. Production Planning, Control, and Integration. McGraw-Hill Companies. USA, 1997.

Course information Perencanaan proses, Pemetaan dan Analisis Metode Kerja, Evaluasi Ergonomi berdasarkan antropometri dan biomekanika, Peramalan Produksi, Perancangan Sistem Produksi Perakitan, Perencanaan & Pengendalian Produksi, Standardisasi Sistem Kerja
Process planning, Mapping and analysis of work methods, Ergonomic evaluation based on anthropometry and biomechanics, Production forecasting, Design of assembly production systems, Production planning & control, Work system standardization
Pre-requisite

  • TI3001 Production Planning and Control
  • TI3002            Work System Design
Co-requisite

  • N/A
Required Course

 

Learning outcomes Mahasiswa mampu mengidentifikasi kebutuhan pasar melalui kegiatan survey dan menerjemahkan kebutuhan menjadi rancangan produk dan mampu merancang sistem kerja yang meliputi stasiun kerja dan lintas produksi dari produk tersebut serta mengelola kegiatan produksinya.
Students are able to identify market needs through surveys and translate needs into the design of products, and are able to design a work systems including work stations and production line, as well as managing their production activities.

 

Student Outcomes a B c d e f g h i j k
R R R R R R R R R

 

Lecture/Lab Topics Covered

Week Topics
1 Topic Expalantion
2 Case 1: Process Planning
3 Discussion & Report Submission : Case 1
4 Case  2 : Mapping Process & Work Metode Analysis
5 Discussion & Report Submission : Case 2
6 Case 3 : Ergonomic Analysis using Antropometric & Biomechanics
7 Discussion & Report Submission : Case 3
8 Case 4 : Demand Forecasting
9 Discussion & Report Submission : Case 4
10 Case 5 : Design Assembly Lines
11 Discussion & Report Submission : Case 5
12 Case 6 : Production Planning & Material Requirement
13 Discussion & Report Submission : Case 6
14 Case 7: Work System Standadizaion
15 Discussion & Report Submission : Case 7